Reserve charges from the grid when site demand is low and discharges to cover compute load spikes that exceed the site's interconnection limit. That means Foundry can operate above the site's capacity to power more IT load.

1
Unlock unused grid capacity to power AI workloads
Commercial and industrial sites are sized for peak demand but only hit it a fraction of the time. Foundry installs behind the meter at developed sites and pairs with Reserve to tap into that unused headroom.

2
More GPUs from the same grid connection

3
Scale quickly by pairing onsite generation
Reserve coordinates multiple sources of generation to meet load and turns on-site renewables into firm, reliable power. Every source added increases the number of powered GPUs on site.